The Noble Denton rules and technical guidelines are developed through extensive research and development, the know-how and experience of our engineers and the close feedback of our worldwide network of technical experts. The rules and guidelines represent the current state of scientific development and industry practice.

0001/ND - Rev 0 - 22 June 2013 - General Guidelines for Marine Projects

These guidelines present material that is common to more than one of the other Noble Denton guidelines for the approval of marine projects and was previously duplicated.

Download 0001

0009/ND Rev 7 - 22 June 2013 - Guidelines for Elevated Operations of Jack-Ups

These guidelines will be used by Noble Denton for the assessment of self-elevating platforms in the elevated condition. They address:

  • General feasibility studies, including optional checks for punch-through resistance and fatigue; such studies may result in a Statement of Compliance
  • Assessment for specific locations; such studies may result in a Certificate of Approval.
Download 0009

0013/ND Rev 7 - 22 June 2013 - Guidelines for Load-Outs

These guidelines have been developed for the loadout of items including offshore jackets, SPAR sections, modules, bridges and components from the shore onto floating or grounded barges and ships.

Download 0013

0015/ND Rev 4 - 22 June 2013 - Concrete Offshore Gravity Structure Construction and Installation

These guidelines have been developed for the marine aspects of construction, towage and installation of offshore concrete Gravity Base Structures (GBS) with a deck. They are intended to be applicable to deep draft structures, where much of the construction work is carried out afloat, as well as shallower draft structures where the construction of the GBS can be essentially completed in dry dock.

Download 0015

0016/ND Rev 7 - 22 June 2013 - Seabed and Sub-seabed Data for Approvals of Mobile Offshore Units

These guidelines describe the seabed and sub-seabed data required by Noble Denton to assess the suitability of locations for independent leg and mat-supported jack-up units, other mobile units operating on the seabed, and anchor installation and performance assessments for floating units.

Download 0016

0021/ND Rev 9 - 22 June 2013 - Guidelines for the Approval of Towing Vessels

These Guidelines are intended to lead to an approval by Noble Denton for entry into the Towing Vessel Approvability Scheme. They also provide guidance for the approval of towing vessels for a specific tow and bollard pull tests. They do not cover the towage of specific vessels or barges, guidance for which may be found in 0030/ND.

Download 0021

0027/ND Rev 10 - 22 June 2013 - Guidelines for Marine Lifting & Lowering Operations

These guidelines have been developed for the design and approval of marine lifting operations, including subsea installations (but excluding pipelines and flowlines).

Download 0027

0028/ND Rev 5 - 22 June 2013 - Guidelines for the Transportation and Installation of Steel Jackets

These guidelines have been developed for the design and approval of the transportation and installation of steel offshore jacket structures.

Download 0028

0029/ND Rev 0 - 22 June 2013 - Guidelines for Submarine Pipeline Installation

This document sets out the Guidelines on which Noble Denton approval of pipeline installation by laying, pulling or towing, would be based.

Download 0029

0030/ND Rev 5 - 22 June 2013 - Guidelines for Marine Transportations

These guidelines will be used by Noble Denton for approval of specialised marine transportations, including:

  • Cargoes on ships or towed barges
  • Towage of self-floating marine and oilfield equipment, civil engineering structures and ships but are not normally intended to apply to 'standard' cargoes such as bulk liquids, bulk solids, refrigerated cargoes, vehicles or containers.
Download 0030

0031/ND Rev 1 - 22 June 2013 - Guidelines for Float-over Operations Installations/Removals

These guidelines have been developed for the float-over installation or removal of structures onto or from a host structure which may be:

  • Offshore pre-installed structures, e.g. jackets and concrete units, or
  • Offshore or inshore floating structures, e.g. TLPs, concrete units and semi-submersibles.
Download 0031

0032/ND Rev 1 - 22 June 2013 - Guidelines for Moorings

These guidelines will be used by Noble Denton for the approval of moorings, including:

  • Offshore catenary or taut leg moorings of mobile offshore units (MOU)
  • Offshore catenary or taut leg mooring of floating offshore installations (FOI)
  • Inshore mooring of MOUs and FOIs, e.g. for stacking
  • Temporary mooring of offshore installations in an afloat condition during construction, installation or decommissioning
  • Quayside mooring of MOUs and FOIs, e.g. during maintenance or conversion
  • Mooring of vessels during loadouts and installation operations.
Download 0032

0035/ND Rev 0 - 22 June 2013 - Guidelines for Offshore Wind Farm Infrastructure Installation

These guidelines have been developed for the installation of offshore wind farms of various types. They mainly refer to other Noble Denton guidelines developed for similar operations, but giving alternatives which may apply to offshore wind farm installations.

Download 0035